← BHP WAIO knowledge base

Operating · Mine

South Flank

An 80 Mtpa operation built to replace production from the ageing Yandi mine and lift the quality of BHP's iron ore products.

Commodity
Iron ore
Location
Approximately 156 km north-west of Newman; 9 km south of Mining Area C
Traditional Country
Banjima Country
Opened / timing
First ore May 2021

Site profile

How the operation fits the system.

Operations

The US$3.6 billion project was approved in 2018. With Mining Area C it forms a 145 Mtpa operating hub.

Ownership

BHP-operated WAIO joint venture asset

Automation & technology

Designed with an autonomous-ready fleet, extensive digital connectivity and modular infrastructure. A redesigned truck hoist-cylinder rollout is reducing material carryback.

Workforce context

BHP reported around 9,000 construction jobs and more than 600 operational roles associated with the development.

LATITUDE23.03° S
LONGITUDE118.98° E
STATUSOperating
PRIMARY MATERIALIron ore
Approximate regional coordinates only — not a site entrance, travel or navigation reference.

Financial context

Mine-level P&L is not publicly separated.

BHP's public reporting consolidates WAIO and Group performance. It does not provide a complete profit-and-loss statement for South Flank as a standalone business. For audited group financials, production context and the live ASX market link, use the parent BHP profile.

Open BHP financial snapshot

Primary source

Verify the operational detail.

This profile was compiled from BHP's official operational and project information. Facts can change with mine plans, approvals and reporting periods.

Open BHP source ↗

Continue through WAIO

Related profiles.