Company knowledge base · Lithium

PLS (Pilbara Minerals)

The operator of Pilgangoora, a large hard-rock lithium mining and processing operation near Port Hedland producing spodumene concentrate.

At a glance

Pilgangoora · Pilbara, Western Australia

PLS's Australian mining footprint is centred on one large operating asset: Pilgangoora. The company also has overseas and downstream interests, but they are not presented here as Australian mines.

This independent summary does not imply affiliation with the operator. Operational status, ownership and mine plans can change; follow the linked company sources for current detail.

CommodityLithium
ProductSpodumene concentrate
Flagship assetPilgangoora
Export routeRoad · Port Hedland

Mine and project directory

2 Australian operations, mapped in plain English.

Operating mines are separated from development, care-and-maintenance and rehabilitation assets. Status and mine plans can change, so each profile links to the operator's current record.

01Operating
Location140 km south-east of Port Hedland, Pilbara, WA

Pilgangoora Operation

PLS's 100%-owned flagship operation mines lithium-bearing pegmatite and produces spodumene concentrate. First production was achieved in 2018, and PLS reports a long-life operation with capacity built around the Pilgan and Ngungaju plants.

Mine type
Open cut · hard-rock lithium
Operating system
Open-cut mining feeds crushing, screening and sensor-based ore sorting before concentration. Covered road haulage moves product to Port Hedland storage and export facilities.
Workforce lens
FIFO mining, processing, laboratory, metallurgy, fixed and mobile maintenance, road-haulage, village and supply-chain roles support the single integrated site.
Official operation profile ↗
02Development / approvals
LocationApproximately 80 km south-south-east of Port Hedland, Pilbara, WA

Lynas Find Project

A proposed small-scale mine with a waste-rock landform and supporting infrastructure. It is a separate project from the producing Pilgangoora operation and should not be treated as an operating site.

Mine type
Proposed small open pit
Operating system
The proposed development remains subject to its project scope, environmental controls and company execution decisions.
Workforce lens
Approvals, environment, heritage, studies and early works are more relevant before any future construction or production crew demand.
Official operation profile ↗

Follow the commodity

Lithium mine to conversion

See how extraction, processing, transport and the final customer handover differ from the Pilbara iron ore model.

Open the pathway →

Workforce lens

Roles across the operating chain.

Job titles, rosters, residential requirements and contractor arrangements differ by site. Use the employer's current advertisement and position description.

Mining operatorsProcess operatorsMetallurgistsLaboratory techniciansElectriciansMechanical fittersBoilermakersHD fittersRoad-train driversMaintenance plannersGeologistsPort logistics
Official careers site ↗

Sources

Start with the operator.

Checked 30 August 2026. Company pages and mine plans change; these links are the current primary reference points.

Official company website ↗
  1. 01PLS — Pilgangoora Operation
  2. 02PLS — Australian careers
  3. 03PLS — crushing and ore sorting
  4. 04PLS — Pilgangoora expansion