← Rio Tinto Iron Ore knowledge base

Operating · Mine hub

Greater Hope Downs

A major Newman-region hub comprising Hope Downs 1, Hope Downs 4 and the approved Hope Downs 2 development.

Product
Hematite iron ore
Location
Approximately 50–100 km north-west of Newman
Traditional Country
Banjima and Nyiyaparli Country
Opened / timing
Hope Downs 1 in 2007; Hope Downs 4 in 2013

Site profile

How the operation fits Rio Tinto's Pilbara system.

Operations

Hope Downs 2 and Bedded Hilltop are designed for 31 Mtpa combined, with ore hauled to Hope Downs 1 for processing and first ore scheduled for 2027.

Ownership

50:50 joint venture between Rio Tinto and Hancock Prospecting

Automation & technology

The project emphasises reuse of established processing, rail and non-process infrastructure across the joint-venture hub.

Workforce context

Hope Downs 2 is expected to create more than 950 construction jobs and help sustain about 1,000 full-time-equivalent roles across Greater Hope Downs.

LATITUDE22.93° S
LONGITUDE119.13° E
STATUSOperating
PRIMARY PRODUCTHematite iron ore
Approximate regional coordinates only — not a site entrance, travel or navigation reference.

Financial context

Mine-level P&L is not publicly separated.

Rio Tinto reports Group and commodity-level performance but does not provide a complete profit-and-loss statement for Greater Hope Downs as a standalone business. Use the parent profile for current earnings, cash-flow and live ASX context.

Open Rio Tinto financial snapshot

Primary source

Verify the operational detail.

This independent profile was compiled from Rio Tinto's official operational and project information. Facts can change with mine plans, approvals and reporting periods.

Open Rio Tinto source ↗

Continue through the Pilbara

Related profiles.